An ADS 1861 (0x745) timeout indicates that a request was sent to a remote terminal, but no response was received within the specified ADS timeout period. This often points to an issue with the remote terminal's configuration or the network path. The default ADS timeout is 5000 ms.

Likely causes and checks

1Route missing or one-sided on the remote target

Points to it
The client sent the request, but the target system does not have a correctly configured route to respond, or the route is only configured on one side. This is common with new or replaced targets.
Check
Verify that the ADS route exists on both the client (engineering environment) and the target (runtime environment) with the correct AMS NetId and IP address for each side.

2Firewall blocking ADS on the target

Points to it
Even if the target is reachable via ping, a firewall on the target system might be blocking the specific ports used by ADS, preventing the response from reaching the client.
Check
Ensure that incoming TCP port 48898 (and optionally UDP 48899 for search, TCP 8016 for Secure ADS) are allowed through the Windows firewall or any other firewall on the target system.

3Target or network too slow to answer within the timeout

Points to it
If the target system or the network path is under heavy load, or if the ADS requests are large or frequent, the response might not be able to return within the default 5000 ms timeout.
Check
Compare the size and rate of your ADS requests with the configured timeout. You can also trace the response time and check the task exceed counter on the target system to identify performance bottlenecks.

Next check: Start by confirming that the ADS route is correctly configured on both your engineering environment and the TwinCAT 3 XAR runtime target, ensuring the AMS NetId and IP addresses are accurate for both sides.

Work on fuel trains, burners, pressure vessels and electrical equipment must be done by qualified personnel following the manufacturer’s documentation and local codes. Never bypass a safety device or interlock.